ACCEPTANCE TESTING OF SOFTWARE AND HARDWARE SYSTEM OF PTK ASR TO AUTOMATIC REGULATING SYSTEM OF TURBINE DIVISION OF ZAPORIZHZHYA NPP TO THE EXTENT OF THE SECOND STAGE OF SUPPLY

In August 2014, the acceptance testing of the software and hardware system of the PTK ASR TO automatic regulating system of turbine division for Zaporizhzhya NPP was carried out at the testing ground of PJSC “SRPA “Impulse”.

The representatives of the State Nuclear Regulatory Inspectorate of Ukraine, SS “Zaporizhzhya NPP” and PJSC “SRPA “Impulse” took part in the testing.

PTK ASR TO, submitted for the acceptance testing, is designated to implement the functions of automatic regulation, functional-group control, remote control of valves, regulating valves, interlockings, signalling on state of turbine division’s equipment.

The results of the acceptance testing confirmed that PTK ASR TO (to the extent of the second stage of supply) meets the requirements of the requirements specification, the requirements of the normative nuclear and radiation safety documents and confirmed readiness to be supplied to Zaporizhzhya NPP-1.


SRPA “Impulse” is a leading Ukrainian designer, manufacturer, and supplier of highly-reliable instrumentation and control systems for nuclear power engineering and railways.
 
We are on social media: