In November 2014, the acceptance testing of the SUA TPKV system to monitor the emergency “Coolant leak from the primary circuit to the secondary one with the equivalent section Dy 100” for ZNPP-2 was carried out at the testing ground of PJSC “SRPA “Impulse”.

...

In October 2014, the acceptance testing of the instrumentation and control system for post-accident monitoring of the reactor facility (I&C of PAMS) and of the equipment monitoring the level in the reactor (ASKUT) for Unit 1 of Zaporizhzhya NPP was carried out at the testing ground of PJSC “SRPA “Imp...

In October 2014, the acceptance testing of the complex system for diagnostics of WWER-1000 reactor’s equipment of Unit 1 of Zaporizhzhya NPP was carried out at the testing ground of PJSC “SRPA “Impulse”.

...

At the end of September 2014, the acceptance testing of the software and hardware to modernize the lower level of IVS (NU IVS) of Unit 1 of Zaporizhzhya NPP was carried out at the testing ground of PJSC “SRPA “Impulse”.

...

In October 2014, the acceptance testing of the SUA TPKV system to monitor the emergency “Coolant leak from the primary circuit to the secondary one with the equivalent section Dy 100” for ZNPP-1 was carried out at the testing ground of PJSC “SRPA “Impulse”.

...

SRPA “Impulse” is a leading Ukrainian designer, manufacturer, and supplier of highly-reliable instrumentation and control systems for nuclear power engineering and railways.
 
We are on social media: